Optique NewLook, Luxembourg
As you can see, you can see more.
After choosing your new glasses at the optician, it may be worth to look upwards.
Here, in cooperation with the architecture company "concept-s design", we were able to bring the ceiling design in shape.
Flawless white ceilings, a sophisticated lighting concept with lighting elements for a shadowless work are the result.
The ceiling design compared before and after
Friendly and welcoming.
The typical Odenwald ceiling, a dark mood.
Before the refurbishment, the Optique NewLook consulting and showroom in Luxembourg did not seem very inviting and out-of-date. Especially in the fast-moving market in eyewear fashion, it is important to offer the products on the right platform to remain appealing to demanding customers.
The optimal lighting concept.
A well-thought-out room lighting is not only important for the presentation of its products, there are many more requirements to be considered. Does the customer feel comfortable with us, can our employees work well, do we show what we want to show?
Nothing was left to chance when it came to the lighting of this project:
Lateral ceiling spotlights that illuminate the display. Large recessed spotlights to provide a pleasant basic lighting for the room and finally, the workplaces for counseling sessions are equipped with a light ceiling sail, which ensures an almost shadow-free light.
Spot lighting
for the optimal presentation of the display
Recessed Spotlights
for a pleasant and inviting basic illumination
Individual ceiling sails
for shadow-free work- and consultation-places
Details of the project
planning
shop fitting and object design GmbH
Execution (ceiling)
Optimaler Sàrl
Manufacturer of light sails
Conditions
Ceiling renovation in the showroom in collaboration with interior designers
(as part of a complete renovation)
Planning and design of lighting elements
Planned time frame for the ceiling installation: 4 working days
Details
63,24 sqm stretched ceiling with CLIPSO 705s standard fabric for flawless surfaces
2 individually manufactured light-sails for shadow-reduced lighting
19,5 hours of time for the entire construction project